A new 90,000 SF parkade for foot passenger drop off and short term parking, as well as a 10,000 SF structural steel deck with concrete columns and piled footings.
A new ramp structure to berths 2 & 3 to raise them to the new elevations required by the fast cat ferries and expand ramp width
A new water treatment plant, tying in an existing storage reservoir and extending the raw water supply main.
Expansion of the existing water treatment plant to include a new reservoir, complete system upgrade, and a tie-in to the existing fire hall complete with a new distribution system.
CCM Completed this Design-build project for the fast cat ferry assembly for Catamaran Ferries International.
A Concrete water intake structure for the Chilliwack River hatchery including a temporary cofferdam in the Chilliwack River.